Game Info

↑ Back to top
Legend of Zero
N/A
PC
Game

Legend of Zero

Released: Aug 4, 2022
Genres:
Roguelike / Roguelite Role-playing (RPG) Strategy Tactical
Themes:
Fantasy Fire Emblem Indie
Game Modes:
Single player

Overview

↑ Back to top
Description from Steam STEAM

This game is based on Fire Emblem and is extremely similar to the previous game I made, except much simpler. I've taken out all the unnecessary hustles and you should progress the storyline fair quickly as there isn't much of a story. The game itself is just a typical tactical RPG with only 5 playable characters and 11 chapters in total, should take you an hour to finish. Most characters can promote once they reach level 15 and learn skills at level 10 and 20, hope you enjoy!

Description from IGDB IGDB

This game is based on Fire Emblem, a typical tactical RPG with 5 playable characters and 11 chapters in total.

About Legend of Zero

Legend of Zero is a Roguelike / Roguelite, Role-playing (RPG), Strategy, Tactical game released in 2022 that offers Single player gameplay playable on PC (Microsoft Windows) with 0 user ratings averaging 0/100. The game explores themes like Fantasy, Fire Emblem, Indie. If you enjoy Legend of Zero, you might also like similar games in our database of 45,000+ titles.

Basic Info
Release Date: August 4, 2022
IGDB ID: 225601

Details

↑ Back to top
Additional Information
Release Date: August 4, 2022
IGDB ID: 225601
Платформы 1
PC
Genres 4
Roguelike / Roguelite Role-playing (RPG) Strategy Tactical
Themes 3
Fantasy Fire Emblem Indie
Game Modes 1
Single player

Companies

↑ Back to top
No Companies Available

Company information for this game hasn't been loaded yet.

Keywords

↑ Back to top
game 38048 video 18734 develop 17064 character 16396 release 15455 base 15453 story 14536 make 14384 take 14371 publish 13338 skill 9888 level 9243 Nintendo 5605 Learn 4930 japan 4095 enjoy 3918 progress 3887 tactic 3575 simple 3432 tactical 3273 advance 3104 reach 2990 hour 2849 legend 2835 north 2500 fire 2425 race 2422 playable 2204 boy 2156 america 2109 hope 2090 storyline 2021 previous 1932 similar 1886 chapter 1596 europe 1432 total 1365 quickly 1319 finish 1052 isn 1030 inc 602 extremely 501 tactical rpg 450 typical 383 fair 335 promote 275 hustle 78 emblem 73 unnecessary 68

Screenshots

↑ Back to top

Similar Games

↑ Back to top
Rating: 81.8
Linux Mac Switch PC
PS4 Vita XOne iOS
Game
Darkest Dungeon
Roguelike / Roguelite Role-playing (RPG) Squad Management Strategy Tactical Turn-based Turn-based strategy (TBS)
Side view
2016
Rating: 68.1
PC 360
Game
Fable III
Open World Roguelike / Roguelite Role-playing (RPG) Sandbox Strategy Tactical
Third person
2010
Rating: 87.4
Mac Switch PC PS4
PS5 XOne XBS
Game
Darkest Dungeon II
Roguelike / Roguelite Role-playing (RPG) Squad Management Strategy Tactical Turn-based Turn-based strategy (TBS)
Side view
2023
Rating: 66.1
3DS
Game
Pokémon Mystery Dungeon: Gates to Infinity
Roguelike / Roguelite Role-playing (RPG) Strategy Tactical
Bird view / Isometric
2012
Rating: 69.9
Linux Mac PC
Game
Iratus: Lord of the Dead
Roguelike / Roguelite Role-playing (RPG) Squad Management Strategy Tactical Turn-based Turn-based strategy (TBS)
Side view
2020
Rating: 50.4
Droid Linux Mac PC
iOS
Game
10000000
Action Base Building Puzzle Roguelike / Roguelite Role-playing (RPG) Strategy Tactical
Side view
2012
Rating: 79.1
Linux Mac Switch PC
Game
Pathway
Roguelike / Roguelite Role-playing (RPG) Squad Management Strategy Tactical Turn-based Turn-based strategy (TBS)
Bird view / Isometric
2019
Rating: 61.0
Droid Linux Mac Switch
PC iOS
Game
Reigns: Game of Thrones
Role-playing (RPG) Strategy Tactical
Side view
2018
Rating: 52.1
PC
Game
Ancient Enemy
Card & Board Game Roguelike / Roguelite Role-playing (RPG) Strategy Tactical Turn-based Turn-based strategy (TBS)
2020
Rating: 89.6
Linux Mac Switch PC
PS4 Vita iOS
DLC
Darkest Dungeon: The Crimson Court
Roguelike / Roguelite Role-playing (RPG) Squad Management Strategy Tactical Turn-based Turn-based strategy (TBS)
Side view
2017
Rating: 78.0
Droid Mac PC iOS
Game
Card Crawl
Card & Board Game Roguelike / Roguelite Role-playing (RPG) Strategy Tactical Turn-based strategy (TBS)
2015
Rating: 77.7
Stadia Linux Mac Switch
PC PS4 PS5 XOne
Game
Roguebook
Card & Board Game Puzzle Roguelike / Roguelite Role-playing (RPG) Strategy Tactical Turn-based Turn-based strategy (TBS)
Bird view / Isometric Side view
2021